The improvement works at Torrecilla beach are coming to an end, with the new stainless steel railings being installed on top of the new wall.
The old railings were removed as they were in a very poor condition, having rusted badly in the sea air. The total cost of the renewal work on this section of the seafront promenade is €50,000.